SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control
SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control
Fast Delivery
Free returns
Couldn't load pickup availability
Returns
Returns
We accept returns within 30 days of delivery. Items must be unworn, unwashed, and returned with original tags attached.
Care Instructions
Care Instructions
To preserve the beauty of your dress, we recommend gentle hand washing or dry cleaning. Do not bleach. Hang or lay flat to dry. Steam or iron on low heat if needed.
Shipping
Shipping
Orders are processed within 1–3 business days.
- Standard Shipping: 5–9 business days — $3.95
- Express Shipping: 4–7 business days — $9.95
Delivery times are estimates and may vary depending on your location. Tracking information will be provided once your order has been shipped.
Racing is all about control, precision, and immersion. The sim racing pedals from SIMJACK deliver a professional-grade experience with pressure sensor and load cell technology that mimics the feel of real car pedals. Built with a durable hydraulic system, these pedals respond naturally to every press, giving you consistent feedback lap after lap. Whether you’re training for competition or looking to elevate your PC racing setup, the hydraulic racing pedals offer the realism and reliability serious drivers demand.
Key Features
-
Advanced load cell and pressure sensor for true-to-life braking response.
-
Hydraulic pedal design provides smooth, consistent resistance.
-
Sturdy metal construction ensures durability for long sessions.
-
Adjustable setup for custom fit and driving style.
-
Plug-and-play compatibility with PC racing simulators.
Why Choose Our SIMJACK UT Sim Racing Pedals
Most entry-level pedals rely on springs, leading to inconsistent feel and limited realism. The SIMJACK UT stands apart with a hydraulic load cell system that translates pressure into accurate braking power—just like in a real race car. Its precision and reliability help you improve lap times, train muscle memory, and enjoy a far more immersive simulation compared to standard pedal sets.
Perfect For
-
Serious sim racing enthusiasts upgrading their setup.
-
PC gamers who want authentic pedal feedback.
-
Training environments for aspiring drivers.
-
Racing simulator builds designed for endurance and immersion.
Product Specs
-
Pedal Type: UT Hydraulic Load Cell
-
Compatibility: PC Sim Racing Systems
-
Materials: High-strength metal body with hydraulic system
-
Sensors: Pressure + Load Cell
Drive With Realism, Compete With Confidence
Step into the race with SIMJACK UT Sim Racing Pedals and feel the difference of true hydraulic control. Upgrade your simulator today and experience professional-level performance from the comfort of your home.

what our customers say about us
4.9
Based on 100+ Reviews
Review this product
Share your thoughts with other customers
-
EEmily R.Verified BuyerPerfect for a summer weddingI wore this to my cousin's wedding and felt amazing all day. The fit was exactly as expected, and I received so many compliments. I ordered my usual size S.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 23 2
-
OOlivia H.Verified BuyerBeautiful dressReally happy with this purchase. I only wish I had steamed it before trying it on because it arrived with a few wrinkles from shipping.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
SSarah T.Verified BuyerSo flatteringI have a hard time finding dresses that fit my waist properly, but this one was perfect. Very comfortable to wear for several hours.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
CChloe W.Verified BuyerWorth every dollarThe quality surprised me. The material has a nice weight and doesn't feel see-through at all. I'll definitely order another style.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
AAmanda K.Verified BuyerEngagement photo approvedBought this for our engagement photos and couldn't be happier. It looked beautiful in natural light and fit perfectly.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
NNicole B.Verified BuyerRuns slightly roomyI was between sizes and ordered the larger one. It still looked great, but I probably could have gone with my usual size.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
HHannah C.Verified BuyerComfortable all eveningWore this to a formal dinner and didn't have to adjust it once. It stayed comfortable from start to finish.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
MMegan L.Verified BuyerLove the qualityBeautiful stitching and a really elegant design. It feels much more expensive than it actually is.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
RRachel S.Verified BuyerTrue to sizeI followed the size chart and ordered a Medium. It fit exactly the way I wanted.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
AAshley D.Verified BuyerReceived so many complimentsEveryone kept asking where I bought this dress. It's simple, elegant, and easy to accessorize.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
LLauren P.Verified BuyerVacation favoritePacked this for my trip to Italy and wore it twice. It's lightweight, comfortable, and photographs beautifully.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
BBrittany G.Verified BuyerLovely dressThe zipper was a little stiff the first time, but after wearing it once everything worked perfectly. Overall, I'm very happy.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0
-
KKayla N.Verified BuyerHelpful customer serviceI wasn't sure which size to buy, so I contacted support first. They recommended a Small, and it fit perfectly.SIMJACK UT Sim Racing Pedals – Hydraulic Load Cell Pedals with Pressure Sensor for Realistic PC Racing Simulator Control Was this helpful? 0 0